Toggle Menu

Planning Application

This page displays details of the selected application and its progress. The information and images are retrieved from the Council's Planning database. The scanning process takes place after the application has been validated, hence images for recent applications may not yet be displayed.

If the application has not been determined and provided it is before the consultation expiry date, you can use the Comment on this Application button to make representations on the proposal which will be forwarded to the Case Officer. Guidance is available for making comments on a planning application here.

For further information on how to view the working file.

Please Note : The End of Public Consultation period date is based on the earliest date a decision can be made following public consultation on an application. This date is a live field and is updated throughout the application stage based on consultations, revised consultations, site notices and press advertisement dates, where required. Therefore this date is subject to change and if you are unsure or require further information you are advised to check with the Case Officer.

Application Details
Application number HPK/2021/0139 Application type Full - MINOR
Site address 16 , Green Lane , Buxton , Derbyshire , SK17 9DP Proposal Change of use of existing 10 room bed and breakfast into 5 self-contained apartments including removal of existing side fire escape staircase; erection of two storey rear extension over existing garage footprint; demolition of uPVC rear porch; new porch to side elevation; roof lights to front and rear roofscapes; flat roof dormer to rear elevation; waste and recycling facilities; and other external cosmetic alterations.
Applicant name Mr Richard Lench
Soane Adam Ltd
Agent name Amanda Olley
Summit Planning Associates Ltd
Applicant address 18 Bond End , Yoxall , DE13 8HN Agent address The Studio, 4th Floor , Manchester , M2 7LG
Application status Consultations/Re-consultations issued

Received date 16/03/2021 Valid date 16/03/2021
Fee due 0.00 Fee paid 0.00
Determination required date 11/05/2021 Agreed extended date 15/06/2021
Case Officer Tom Hiles
Start of Public Consultation period 25/03/2021 End of Public Consultation period 24/04/2021
Referred to Secretary of State date Referral expiry date
Decision by Delegated Decision Committee date
Decision Awaiting Decision Decision Date
Temp permission expiry date Permission expiry date
Legal Obligation ref.

Consultations
Name Address
County Planning (Highways) Highways Section, County Hall, Matlock, Derbyshire, DE4 3AG
Severn Trent Water Ltd Operations Management Ltd, Asset Protection (Waste Water) East, Leicester Water Centre, Gorse Hill, Leicester, LE7 7GU
Buxton Mineral Water Ltd Nestle Waters (UK) Ltd, Waterswallows Lane, Fairfield, Buxton, Derbyshire, SK17 7JD
HPBC Arboricultural Officer Arboricultural Officer, Town Hall, Buxton,
HPBC Waste (Operational Services) LEEK
HPBC Conservation Conservation Officer, Buxton,
Cllr Emily Thrane Temple Ward ,
The Owner / Occupier 14, GREEN LANE, BUXTON, SK17 9DP
The Owner / Occupier 15, GREEN LANE, BUXTON, SK17 9DP
The Owner / Occupier 18, GREEN LANE, BUXTON, SK17 9DP
The Owner / Occupier 5, SPENCER GROVE, BUXTON, SK17 9DU
The Owner / Occupier 7, SPENCER GROVE, BUXTON, SK17 9DU

Attachments - Click the Description to view the attachment in a new window.
Date Description
25/03/2021 101-A-Site Location Plan and Block Plan
25/03/2021 102-A-Existing Site Plan
25/03/2021 03-A-Existing Floor Plan 1of3
25/03/2021 104-A-Existing Floor Plan 2of3
25/03/2021 105-A-Existing Floor Plan 3of3
25/03/2021 106-A-Existing Elevations 1of3
25/03/2021 107-A-Existing Elevations 2of3
25/03/2021 108-A-Existing Elevations 3of3
25/03/2021 109-B-Proposed Site Plan
25/03/2021 110-C-Proposed Floor Plans 1 of 4
25/03/2021 111-F-Proposed Floor Plans 2 of 4
25/03/2021 112-E-Proposed Floor Plans 3 of 4
25/03/2021 113-B-Proposed Floor Plans 4 of 4
25/03/2021 114-B-Proposed Elevations 1 of 3
25/03/2021 115-B-Proposed Elevations 2 of 3
25/03/2021 116-B-Proposed Elevations 3 of 3
25/03/2021 121-A-Refuse and Recycling Details
25/03/2021 122-A-Sash Window Details
25/03/2021 123-Proposed Section through Basement Window
25/03/2021 Design and Access Statement
25/03/2021 Application Form
25/03/2021 Heritage Statement
25/03/2021 Sustainability Statement
25/03/2021 Tree Survey
25/03/2021 WINDOWS
19/04/2021 Consultation Response - Alliance Environmental Services
21/04/2021 Consultation Response - DCC Highways

Share this page

Share on Facebook Share on Twitter Share by email

Print

Print this page