Toggle Mobile Menu Visibility
Toggle Search Controls Visibility

Planning application details

This page displays details of the selected application and its progress. The information and images are retrieved from the Council's Planning database. The scanning process takes place after the application has been validated, hence images for recent applications may not yet be displayed.

If the application has not been determined and provided it is before the consultation expiry date, you can use the Comment on this Application button to make representations on the proposal which will be forwarded to the Case Officer. Guidance is available for making comments on a planning application here.

For further information on how to view the working file.

Please Note : The End of Public Consultation period date is based on the earliest date a decision can be made following public consultation on an application. This date is a live field and is updated throughout the application stage based on consultations, revised consultations, site notices and press advertisement dates, where required. Therefore this date is subject to change and if you are unsure or require further information you are advised to check with the Case Officer.

Application Details
Application number HPK/2020/0012 Application type Full - MINOR
Site address Land Adjacent To 15, Carr Road, Buxton, Derbyshire, Proposal Construction of 2 new, 3 storey semi detached dwellings on land adjacent to Carr Road
Applicant name Mr Nigel Collins

Agent name Mr Andrew Smith

AJS Architecture
Applicant address Carr Road, Buxton, SK17 6WF Agent address 32, Buxton, Derbyshire, SK17 6WF
Application status FULL-APP
Received date 16/01/2020 Valid date 16/01/2020
Fee due 924.00 Fee paid 924.00
Determination required date 12/03/2020 Agreed extended date 13/03/2020
Case Officer Laura Barrowclough
Start of Public Consultation period 17/01/2020 End of Public Consultation period 13/02/2020
Referred to Secretary of State date Referral expiry date
Decision by Delegated Decision Committee date
Decision Planning Permission - Approved Decision Date 13/03/2020
Temp permission expiry date Permission expiry date 13/03/2023
Legal Obligation ref.

Site visits
Officer
Date
LBA 24/01/2020

Consultations
Name Address
Peak & Northern Footpaths Society
Ramblers Association Stockport,
Severn Trent Water Ltd Operations Management Ltd, Asset Protection (Waste Water) East, Leicester Water Centre, Gorse Hill, Leicester, LE7 7GU
Buxton Mineral Water Ltd Nestle Waters (UK) Ltd, Waterswallows Lane, Fairfield, Buxton, Derbyshire, SK17 7JD
County Planning (Highways) Highways Section, County Hall, Matlock, Derbyshire, DE4 3AG
HPBC Environmental Health Town Hall, Buxton,
The Owner / Occupier 15, CARR ROAD, BUXTON, SK17 6WF
Cllr Samantha Flower Burbage,
The Owner / Occupier 48, CARR ROAD, BUXTON, SK17 6WF
The Owner / Occupier 54, CARR ROAD, BUXTON, SK17 6WF
The Owner / Occupier 46, CARR ROAD, BUXTON, SK17 6WF
The Owner / Occupier 54, WASHBROOK, LEVEL LANE, BUXTON, SK17 6TU
The Owner / Occupier 53, WASHBROOK, LEVEL LANE, BUXTON, SK17 6TU
HPBC Waste (Operational Services) LEEK

Attachments - Click the Description to view the attachment in a new window.
Date Description
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-3 BED BLOCK PLAN-PARKING 01
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-BLOCK PLAN 01
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-LOCATION PLAN
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-MATERIAL SAMPLES
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PHOTO CONTEXT PLAN 01
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PHOTO CONTEXT PLAN 02
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 01 Ground Floor
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 02 First Floor
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 03 Second Floor
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 04 Roof Plan
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 05 Foundations
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 06 Joist & Rafter
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 07 2nd Floor Joists
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 08 Rafter
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 09 Front Elevation
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 10 Rear Elevation
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 11 Gable Elevation
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 12 Gable Elevation
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 13 Front & Rear Street Scene
17/01/2020 A3 DRAWINGS - FOR CONSTRUCTION-PROPOSED 14 Section
17/01/2020 Application Form
17/01/2020 Design Statement
17/01/2020 Master Spec
20/01/2020 Consultation Response Peak & Northern Footpath Society
21/01/2020 Consultation Response Highways
22/01/2020 Consultation Response Alliance Environmental Services
31/01/2020 Public comment Caroline Hollis
03/02/2020 public comment Nicholas Scott
03/02/2020 public comment Nicholas Scott
11/02/2020 internal response environmental health pollution
27/02/2020 Highways Comments
28/02/2020 Revised Plans - Block Plan 01A
28/02/2020 Revised Plans - Boundary Block Plan
28/02/2020 Revised Plans - Location Plan
28/02/2020 Revised Plans - Material Samples
28/02/2020 Revised Plans - Original Street Scene
28/02/2020 Revised Plans - Photo Context Plan 01
28/02/2020 Revised Plans - Photo Context Plan 02
28/02/2020 Revised Plans - Proposed 01A
28/02/2020 Revised Plans - Proposed 02A
28/02/2020 Revised Plans - Proposed 03A
28/02/2020 Revised Plans - Proposed 04A
28/02/2020 Revised Plans - Proposed 05
28/02/2020 Revised Plans - Proposed 06A
28/02/2020 Revised Plans - Proposed 07A
28/02/2020 Revised Plans - Proposed 08A
28/02/2020 Revised Plans - Proposed 09A
28/02/2020 Revised Plans - Proposed 10A
28/02/2020 Revised Plans - Proposed 11A
28/02/2020 Revised Plans - Proposed 12A
28/02/2020 Revised Plans - Proposed 13A
28/02/2020 Revised Plans - Proposed 14A
28/02/2020 Revised Plans - Site Sections 01
28/02/2020 Revised Plans - Street Scene 01
28/02/2020 Revised Plans - Drawigs as approved in 2007
28/02/2020 Revised Plans - Plan as approved 2007
04/03/2020 Consultation Response DCC Highways
12/03/2020 Revised Plans - Block Plan 01B
12/03/2020 Revised Plans - Boundary Block Plan B
12/03/2020 Revised Plans - Block Plan 01B
13/03/2020 Delegated report
13/03/2020 Decision notice