Toggle Mobile Menu Visibility
Toggle Search Controls Visibility

Planning application details

This page displays details of the selected application and its progress. The information and images are retrieved from the Council's Planning database. The scanning process takes place after the application has been validated, hence images for recent applications may not yet be displayed.

If the application has not been determined and provided it is before the consultation expiry date, you can use the Comment on this Application button to make representations on the proposal which will be forwarded to the Case Officer. Guidance is available for making comments on a planning application here.

For further information on how to view the working file.

Please Note : The End of Public Consultation period date is based on the earliest date a decision can be made following public consultation on an application. This date is a live field and is updated throughout the application stage based on consultations, revised consultations, site notices and press advertisement dates, where required. Therefore this date is subject to change and if you are unsure or require further information you are advised to check with the Case Officer.

Application Details
Application number HPK/2019/0517 Application type Full - MINOR
Site address Byth El Sharmar, Dale Lane, Fairfield, Buxton, Derbyshire, SK17 7LA Proposal Proposed construction of a new detached dwelling off Dale Lane
Applicant name Mr Steve Coates

Agent name Mr Andrew Smith

AJS Architecture
Applicant address Town end, Fairfield, Buxton, SK17 7EN Agent address 32, Buxton, Derbyshire, SK17 6WF
Application status FULL-APP
Received date 25/11/2019 Valid date 10/01/2020
Fee due 462.00 Fee paid 462.00
Determination required date 06/03/2020 Agreed extended date 29/06/2020
Case Officer James Stannard
Start of Public Consultation period 10/01/2020 End of Public Consultation period 10/02/2020
Referred to Secretary of State date Referral expiry date
Decision by Delegated Decision Committee date
Decision Planning Permission - Approved Decision Date 29/06/2020
Temp permission expiry date Permission expiry date 29/06/2023
Legal Obligation ref.

Site visits
Officer
Date
JAS 20/01/2020

Consultations
Name Address
County Planning (Highways) Highways Section, County Hall, Matlock, Derbyshire, DE4 3AG
County Planning (Flood Risk Management)
Environment Agency HPBC Lower Trent Area, Trentside Offices,, Scarrington Rd, West Bridgford, Nottingham, Nottinghamshire, NG2 5FA
Severn Trent Water Ltd Operations Management Ltd, Asset Protection (Waste Water) East, Leicester Water Centre, Gorse Hill, Leicester, LE7 7GU
HPBC Environmental Health Town Hall, Buxton,
The Owner / Occupier ABBIEDALE, DALE LANE, FAIRFIELD, BUXTON, SK17 7LA
Cllr Fiona Sloman Stone Bench Ward,
Cllr David Kerr Stone Bench Ward,
The Owner / Occupier UNIT 12, TONGUE LANE INDUSTRIAL ESTATE, DEW POND LANE, FAIRFIELD, BUXTON, SK17 7LF
The Owner / Occupier OTTER CONTROLS, TONGUE LANE INDUSTRIAL ESTATE, DEW POND LANE, FAIRFIELD, BUXTON, SK17 7LF
HPBC Waste (Operational Services) LEEK

Attachments - Click the Description to view the attachment in a new window.
Date Description
10/01/2020 BLOCK PLAN 13.
10/01/2020 BLOCK PLAN 14
10/01/2020 BLOCK PLAN 15.
10/01/2020 PROPOSED 01.
10/01/2020 PROPOSED 02
10/01/2020 PROPOSED 03
10/01/2020 PROPOSED 04
10/01/2020 PROPOSED 05.
10/01/2020 PROPOSED 06
10/01/2020 PROPOSED 07
10/01/2020 PROPOSED 08
10/01/2020 PROPOSED 09.
10/01/2020 PROPOSED 10
10/01/2020 PROPOSED 11
10/01/2020 PROPOSED 12
10/01/2020 SITE LOCATION 01A.
10/01/2020 SITE LOCATION 02A
10/01/2020 Application Form
10/01/2020 DESIGN STATEMENT
10/01/2020 MASTER SPEC
10/01/2020 FLOOD RISK ASSESMENT
16/01/2020 Consultation response Waste
20/01/2020 Consultation Response Flood Risk Management
21/01/2020 Consultation Response Highways
23/01/2020 Consultation Response Environment Agency
29/01/2020 Consultation response Environmental Health Consultation
28/02/2020 Consultation Response Highways
04/03/2020 Consultation Response DCC Highways
09/03/2020 consultation response scc flood risk team.
06/04/2020 Consultation Response HPBC Planning Policy
17/06/2020 Revised Block Plan 01 - 17/06/2020
17/06/2020 Revised Block Plan 02 - 17/06/2020
17/06/2020 Revised Plans 01A - 17/06/2020
17/06/2020 Revised Plans 02A - 17/06/2020
17/06/2020 Revised Plans 03A - 17/06/2020
17/06/2020 Revised Plans 04A -17/06/2020
17/06/2020 Revised Plans 05A - 17/06/2020
17/06/2020 Revised Plans 06A - 17/06/2020
17/06/2020 Revised Plans 07A - 17/06/2020
17/06/2020 Revised Plans 08A - 17/06/2020
17/06/2020 Revised Plans 09A - 17/06/2020
17/06/2020 Revised Plans 10A - 17/06/2020
17/06/2020 Revised Plans 11A - 17/06/2020
17/06/2020 Revised Plans 12A - 17/06/2020
17/06/2020 Revsed Site Location Plan 01A - 17/06/2020
17/06/2020 Revised Site Location Plan 02A - 17/06/2020
29/06/2020 Report
29/06/2020 Decision
29/06/2020 Consultation Response DCC Highways 2