Toggle Mobile Menu Visibility
Toggle Search Controls Visibility

Planning application details

This page displays details of the selected application and its progress. The information and images are retrieved from the Council's Planning database. The scanning process takes place after the application has been validated, hence images for recent applications may not yet be displayed.

If the application has not been determined and provided it is before the consultation expiry date, you can use the Comment on this Application button to make representations on the proposal which will be forwarded to the Case Officer. Guidance is available for making comments on a planning application here.

For further information on how to view the working file.

Please Note : The End of Public Consultation period date is based on the earliest date a decision can be made following public consultation on an application. This date is a live field and is updated throughout the application stage based on consultations, revised consultations, site notices and press advertisement dates, where required. Therefore this date is subject to change and if you are unsure or require further information you are advised to check with the Case Officer.

Application Details
Application number HPK/2019/0172 Application type Full - Householder
Site address 6, Dolby Road, Harpur Hill, Buxton, Derbyshire, SK17 9PW Proposal Demolition of side porch extension, construction of new front porch extension, two storey side extension and single storey rear extension
Applicant name Mr Ian Goodwin

Agent name Mr Andrew Smith

AJS Architecture
Applicant address Dolby Road, Buxton, SK17 9PW Agent address 32, Buxton, Derbyshire, SK17 6WF
Application status FULL-APP
Received date 23/04/2019 Valid date 23/04/2019
Fee due 206.00 Fee paid 206.00
Determination required date 18/06/2019 Agreed extended date
Case Officer Chris Johnston
Start of Public Consultation period 08/05/2019 End of Public Consultation period 30/05/2019
Referred to Secretary of State date Referral expiry date
Decision by Delegated Decision Committee date
Decision Planning Permission - Approved Decision Date 18/06/2019
Temp permission expiry date Permission expiry date
Legal Obligation ref.

Consultations
Name Address
Severn Trent Water Ltd Operations Management Ltd, Asset Protection (Waste Water) East, Leicester Water Centre, Gorse Hill, Leicester, LE7 7GU
Buxton Mineral Water Ltd Nestle Waters (UK) Ltd, Waterswallows Lane, Fairfield, Buxton, Derbyshire, SK17 7JD
County Planning (Highways) Highways Section, County Hall, Matlock, Derbyshire, DE4 3AG
Cllr Colin Leslie Boynton Cote Heath Ward,
Cllr Linda Grooby Cote Heath,
The Owner / Occupier 16, DOLBY ROAD, HARPUR HILL, BUXTON, SK17 9PW
The Owner / Occupier 7, DOLBY ROAD, HARPUR HILL, BUXTON, SK17 9PW
The Owner / Occupier 12, DOLBY ROAD, HARPUR HILL, BUXTON, SK17 9PW
The Owner / Occupier 13, DOLBY ROAD, HARPUR HILL, BUXTON, SK17 9PW
The Owner / Occupier 14, DOLBY ROAD, HARPUR HILL, BUXTON, SK17 9PW
The Owner / Occupier 15, DOLBY ROAD, HARPUR HILL, BUXTON, SK17 9PW
The Owner / Occupier 5, DOLBY ROAD, HARPUR HILL, BUXTON, SK17 9PW

Attachments - Click the Description to view the attachment in a new window.
Date Description
08/05/2019 Application Form
08/05/2019 DRAWING A3-BLOCK PLAN
08/05/2019 DRAWING A3-EXISTING 01 GROUND FLOOR
08/05/2019 DRAWING A3-EXISTING 02 FIRST FLOOR
08/05/2019 DRAWING A3-EXISTING 03 FRONT ELEVATION
08/05/2019 DRAWING A3-EXISTING 04 REAR ELEVATION
08/05/2019 DRAWING A3-EXISTING 05 SIDE ELEVATION & SECTION
08/05/2019 DRAWING A3-PROPOSED 01 GROUND FLOOR
08/05/2019 DRAWING A3-PROPOSED 02 FIRST FLOOR
08/05/2019 DRAWING A3-PROPOSED 03 FRONT ELEVATION
08/05/2019 DRAWING A3-PROPOSED 04 REAR ELEVATION
08/05/2019 DRAWING A3-PROPOSED 05 SIDE ELEVATION
08/05/2019 DRAWING A3-PROPOSED 06 SECTION
08/05/2019 DRAWING A3-PROPOSED 07 SIDE SECTION.
08/05/2019 DRAWING A3-PROPOSED 08 SECTION
08/05/2019 DRAWING A3-PROPOSED 09 FOUNDATION
08/05/2019 DRAWING A3-PROPOSED 10 JOIST & RAFTER
08/05/2019 DRAWING A3-PROPOSED 11 ROOF STRUCTURE
08/05/2019 DRAWING A3-PROPOSED 12 ROOF PLAN
08/05/2019 DRAWING A3-SITE LOCATION PLAN
08/05/2019 DRAWING A3-SPECIFICATION
14/05/2019 Consultation Response DCC Highways
18/06/2019 Report
18/06/2019 Decision