Application Details |
Application number
|
DOC/2017/0071 |
Application type
|
Discharge of conditions |
Site address
|
Land At
,
Linglongs Road
,
Whaley Bridge
,
Derbyshire
,
|
Proposal
|
Discharge of conditions in relation to HPK/2017/0694 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14,16, 17, 18, 19, 21, 22, 24, 26, 27, 28 |
Applicant name
|
Kevin Furey Baratt Homes |
Agent name
|
Kevin Furey Barratt Homes |
Applicant address
|
Brindley Road
,
Manchester
,
M16 9HQ |
Agent address
|
4
,
City Park
,
Manchester
,
M16 9HQ |
Application status
|
Consultations/Re-consultations issued |
Received date
|
21/07/2017 |
Valid date
|
21/07/2017 |
Fee due
|
97.00 |
Fee paid
|
97.00 |
Determination required date
|
15/09/2017 |
Agreed extended date
|
|
Case Officer
|
Jane Colley
|
Start of Public Consultation period
|
|
End of Public Consultation period
|
06/08/2019 |
Referred to Secretary of State date
|
|
Referral expiry date
|
|
Decision by
|
Planning Committee |
Committee date
|
07/10/2019 |
Decision
|
Discharge of Conditions - Approved |
Decision Date
|
13/03/2020 |
Temp permission expiry date
|
|
Permission expiry date
|
|
Legal Obligation ref.
|
|
Attachments - Click the Description to view the attachment in a new window. |
Date
|
Description
|
04/07/2017 |
Public Comment Jon Hooley
|
04/07/2017 |
Public Comment Jon Hooley
|
15/07/2017 |
Public Comment Jon Hooley
|
07/08/2017 |
Public Comment Jon Hooley
|
17/08/2017 |
Superseded Drainage Calculations
|
17/08/2017 |
Superseded 466_P_01_D_Planning Layout
|
17/08/2017 |
Superseded 466-ED-01_Remediation_ TEN_._Proposed Cut and Fill_B.
|
17/08/2017 |
Superseded 466-ED-02_Drainage Layout_ TEN_._Engineering Layout_C Superseded
|
17/08/2017 |
Superseded 466-ED-18_Roads and Sewers_TEN_._Flood Route Plan_ Superseded
|
17/08/2017 |
Superseded Badger Method Statement
|
17/08/2017 |
Superseded Flood Risk Assessment
|
17/08/2017 |
Superseded Arboricultural Method Statement
|
17/08/2017 |
Superseded Bat mitigation strategy: Trees
|
17/08/2017 |
Superseded Biodiversity Management Plan
|
17/08/2017 |
Superseded Japanese Knotweed Survey & Recommendations
|
17/08/2017 |
Superseded Appendix A - Phasing Plans
|
17/08/2017 |
Superseded Appendix B - Compound Standard Detail
|
17/08/2017 |
Superseded Waste Management Plan
|
17/08/2017 |
Superseded Application form
|
17/08/2017 |
Superseded Construction Method Statement
|
17/08/2017 |
Superseded JK17-2519-01
|
17/08/2017 |
Superseded JK17-2519-02
|
17/08/2017 |
Superseded Noise Assessment Report
|
17/08/2017 |
Superseded Earthworks
|
17/08/2017 |
Superseded Geo-Environmental Report - Coal Extract
|
17/08/2017 |
Public Comment Will Mankiewicz
|
18/08/2017 |
Public Comment Rebecca Simpson
|
24/08/2017 |
Consultation Response Ecologist WL Trust
|
29/08/2017 |
consultation response unitied utilities
|
29/08/2017 |
Public Comment Jon Hooley (1)
|
29/08/2017 |
Public Comment Jon Hooley (2)
|
29/08/2017 |
Public Comment Jon Hooley (3)
|
29/08/2017 |
Public Comment Jon Hooley (4)
|
15/09/2017 |
public comment m wood
|
17/09/2017 |
public comment v o'hare
|
17/09/2017 |
public comment b hancock
|
21/09/2017 |
Public Comment Whaley Bridge Matters
|
21/09/2017 |
Consultation Response Environment Agency
|
21/09/2017 |
Consultation Response Policy
|
21/09/2017 |
Consultation Response Coal Authority
|
27/09/2017 |
public comment j hooley
|
10/10/2017 |
DCC Highway Officer
|
10/10/2017 |
Environmental Health Officer
|
26/10/2017 |
Public Commemt J F Hooley
|
06/11/2017 |
Public comment Whaley Bridge Matters
|
15/01/2018 |
Public comment Whaley Bridge Matters (2)
|
05/02/2018 |
Public Comment Jon Hooley
|
06/02/2018 |
Public comment Whaley Bridge Matters
|
08/02/2018 |
Public Comment Jon Hooley
|
09/03/2018 |
Public comment Whaley Bridge Matters (3)
|
05/04/2018 |
Consultation Response Environmental Health
|
10/05/2018 |
Public Comment Jon Hooley
|
11/05/2018 |
Public comment Martyn Wood
|
25/06/2018 |
Public Comment Jon Hooley
|
28/06/2018 |
Public Comment Jon Hooley
|
22/11/2018 |
Superseded Environmental and Geological Appraisal Report Part 1
|
22/11/2018 |
Superseded Environmental and Geological Appraisal Report Part 2
|
22/11/2018 |
Superseded Environmental and Geological Appraisal Report Part 3
|
22/11/2018 |
Superseded Environmental and Geological Appraisal Report Part 4
|
22/11/2018 |
Superseded Environmental and Geological Appraisal Report Part 5
|
22/11/2018 |
Superseded Environmental and Geological Appraisal Report Part 6
|
22/11/2018 |
Superseded Environmental and Geological Appraisal Report Part 7
|
22/11/2018 |
Superseded Environmental Report Part 1
|
22/11/2018 |
Superseded Environmental Report Part 2
|
22/11/2018 |
Superseded Environmental Report Part 3
|
22/11/2018 |
Superseded Environmental Report Part 4
|
03/01/2019 |
Consultation Response Whaley Bridge Matters
|
10/01/2019 |
Consultation Response Whaley Bridge Matters (2)
|
10/01/2019 |
Consultation Response Whaley Bridge Matters (3)
|
16/01/2019 |
WBM flooding and drainage report
|
16/01/2019 |
180128.v02 WHALEYBR Hydrological and Hydrogeological Review and Crit..
|
16/01/2019 |
Public Comment Whaley Bridge Matters
|
16/01/2019 |
Public Comment Whaley Bridge Matters
|
16/04/2019 |
Public Comment Jon Hooley
|
16/04/2019 |
Public Comment Jon Hooley
|
16/04/2019 |
Public Comment Jon Hooley
|
13/05/2019 |
Public Comment Whaley Bridge Matters
|
24/05/2019 |
Public Comment Whaley Bridge Matters (5)
|
30/05/2019 |
Public comment Jon Hooley
|
30/05/2019 |
Public comment Jon Hooley
|
31/05/2019 |
Public comment Jon Hooley (19)
|
31/05/2019 |
Public comment Jon Hooley (20)
|
31/05/2019 |
Public comment Jon Hooley (21)
|
31/05/2019 |
Public comment Jon Hooley (22)
|
31/05/2019 |
Public comment Jon Hooley (23)
|
01/06/2019 |
Public Comment Whaley Bridge Matters
|
01/06/2019 |
Public Comment Whaley Bridge Matters
|
01/06/2019 |
Public Comment Whaley Bridge Matters
|
01/06/2019 |
Public Comment Whaley Bridge Matters (9)
|
01/06/2019 |
Public Comment Whaley Bridge Matters (10)
|
01/06/2019 |
Public Comment Whaley Bridge Matters (11)
|
01/06/2019 |
Public Comment Whaley Bridge Matters (12)
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - Drainage Calculations
|
11/06/2019 |
Revised Condition 9,10,11,12,13,28 - 466-ED-02_Drainage Layout - Engineering Layout
|
11/06/2019 |
Revised Condition 9,10,11,13 - 466-ED-03_Roads and Sewers - Surface Water Area Plan
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-07_Roads and Sewers - Manhole Details Sheet 1
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-08_Roads and Sewers - Manhole Details Sheet 2
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-09_Roads and Sewers - Manhole Details Sheet 3
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-10_Roads and Sewers - Manhole Details Sheet 4
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-11_Roads and Sewers - Manhole Details Sheet 5
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-12_Roads and Sewers - Engineering Longsections Sheet 1
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-13_Roads and Sewers - Engineering Longsections Sheet 2
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-14_Roads and Sewers - Engineering Longsections Sheet 3
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-15_Roads and Sewers - Detailed Manhole Schedules
|
11/06/2019 |
Revised Condition 9,10,11,13 - 466-ED-18_Roads and Sewer - Flood Route Plan
|
11/06/2019 |
Revised Condition 9,10,11,13 - 466-ED-30_Roads and Sewers - Flow Control Details Sheet 1
|
11/06/2019 |
Revised Condition 9,10,11,13 - 466-ED-31_Roads and Sewers - Flow Control Details Sheet 2
|
11/06/2019 |
Revised Condition 9,10,11,13 - 466-ED-33_Roads and Sewers - Headwall Details
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-35_Drainage Layout - Plot Drainage Sheet 1
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-36_Drainage Layout - Plot Drainage Sheet 2
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-37_Drainage Layout - Plot Drainage Sheet 3
|
11/06/2019 |
Revised Condition 9,10,11,13 - 466-ED-46_Roads and Sewers - Land Drain Deta
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 466-ED-47_Roads and Sewers - Drainage Phasing Plan
|
11/06/2019 |
Revised Condition 9,10,11,13 - 466-ED-53_Roads and Sewers - Proposed Watercourse Structures
|
11/06/2019 |
Revised Condition 9,10,11,12,13 - 5725 -FRA - Issue 2
|
11/06/2019 |
Revised Condition 10,11,13 - 466-ED-52_Roads and Sewers - Existing Watercourse Structures
|
11/06/2019 |
Note form Applicant re Conditions 9, 10, 11 and 13
|
11/06/2019 |
Revised Condition 12 - 17-132-1_Roads and Sewers - Pump Station General Arrangement
|
11/06/2019 |
Revised Condition 12 - 17-132-2_Roads and Sewers - Pump Station Kiosk and Plinth Details
|
11/06/2019 |
Revised Condition 12 - 17-132-3_Roads and Sewers - Pump Station Hazardous Zoning Layout
|
11/06/2019 |
Revised Condition 12 - Technical Submission Document
|
11/06/2019 |
Revised Condition 12 - 466-ED-17_Roads and Sewers - Pump Station Civils
|
11/06/2019 |
Revised Condition 12 - 466-ED-27_Roads and Sewers - Sewer Abandonment Plan
|
11/06/2019 |
Revised Condition 12 - 466-ED-28_Roads and Sewers - Engineering Longsections Rising Main
|
11/06/2019 |
Revised Condition 12 - 466-ED-29_Roads and Sewers - Deep Manhole Details
|
11/06/2019 |
Revised Condition 12 - 466-ED-50_Roads and Sewers - Engineering Longsections Diversion
|
11/06/2019 |
Revised Condition 14 - Coal Extract
|
11/06/2019 |
Revised Condition 14 - Site Investigation AFU Gas Risk Assessment - J-D1747-00-L3-NLC
|
11/06/2019 |
Revised Condition 14 - Earthwork Materials - R-STP3981NM-ES01
|
11/06/2019 |
Revised Condition 14 - Trial Pits
|
11/06/2019 |
Revised Condition 22 - 466-ED-06_Roads and Sewers - Highway Surfacing Plan
|
11/06/2019 |
Revised Condition 22 - 466-P-DF-01-Development Framework
|
11/06/2019 |
Revised Condition 22,24 - 466-P-PL01_Planning Layouts
|
11/06/2019 |
Revised Condition 22 - VD17501-100-01J General Arrangement
|
11/06/2019 |
Revised Condition 22 - VD17501-100-03.1E Tracking-Sheet 1
|
11/06/2019 |
Revised Condition 22 - VD17501-100-04.1D Typical Details Sheet 1
|
11/06/2019 |
Revised Condition 22 - VD17501-100-04.2C Typical Details Sheet 2
|
11/06/2019 |
Revised Condition 22 - VD17501-110-01B Contour Plan
|
11/06/2019 |
Revised Condition 22 - VD17501-120-03B Cross Sections Sheet 3
|
11/06/2019 |
Revised Condition 22 - VD17501-200-01H Site Clearance
|
11/06/2019 |
Revised Condition 22 - VD17501-500-01I Drainage Layout
|
11/06/2019 |
Revised Condition 22 - VD17501-700-01I Pavement Materials
|
11/06/2019 |
Revised Condition 22 - VD17501-1100-01I Kerbs
|
11/06/2019 |
Revised Condition 22 - VD17501-1200-01F Signs and Markings Sheet 1
|
11/06/2019 |
Revised Condition 22 - VD17501-1200-02D Signs and Markings Sheet 2
|
11/06/2019 |
Revised Condition 4 - 466-ED-CMS01-Construction Method Statement Plan 1
|
11/06/2019 |
Revised Condition 4 - 466-ED-CMS01-Construction Method Statement Plan 2
|
11/06/2019 |
Revised Condition 4 - 466-ED-CMS01-Construction Method Statement Plan 3
|
11/06/2019 |
Revised Condition 6 - LE13843 - Noise Assessment Report
|
11/06/2019 |
Revised Condition 7,8 - 466-ED-CMS01- Construction Method Statement Plan 1
|
11/06/2019 |
Revised Condition 7,8 - 466-ED-CMS01- Construction Method Statement Plan 2
|
11/06/2019 |
Revised Condition 7,8 - 466-ED-CMS01- Construction Method Statement Plan 3
|
11/06/2019 |
Revised Condition 7,8 - Appendix B - Compound Standard Detail
|
11/06/2019 |
Revised Condition 7,8 - Appendix C - Waste Management Plan
|
11/06/2019 |
Revised Condition 16 - 6270.02.003 Landscape and Ecological Mitigation Plan
|
11/06/2019 |
Revised Condition 16 - D6270.02.001J Landscape Masterplan
|
11/06/2019 |
Revised Condition 16 - D6270.02.003-012F Detailed Planting Plans
|
11/06/2019 |
Revised Condition 17 - D6270.02.002L Bird and Bat Box Location Plan
|
11/06/2019 |
Revised Condition 18 - 6270.01.001 Bat Mitigation Strategy - Trees
|
11/06/2019 |
Revised Condition 19 - 7637.001 Badger Licensing Strategy
|
11/06/2019 |
Revised Condition 21 - Japanese Knotweed Solutions Proposal
|
11/06/2019 |
Revised Condition 21 - JK17-2519-01 Japanese Knotweed Survey Location Plan
|
11/06/2019 |
Revised Condition 21 - JK17-2519-02 Japanese Knotweed Excavation Plan
|
11/06/2019 |
Revised Condition 23 - Residents Travel Pack
|
11/06/2019 |
Revised Condition 23 - Travel Plan Final Combined - SCP-17314
|
11/06/2019 |
Revised Condition 24 - 466-P-MP01- Planning Layouts Management Plan
|
11/06/2019 |
Revised Condition 27 - Coal Extract
|
11/06/2019 |
Revised Condition 28 - 466-ED-01_Remediation - Proposed Cut and Fill
|
11/06/2019 |
Revised Condition 28 - 466-ED-22 - Retaining Walls - External Levels Sheet 1
|
11/06/2019 |
Revised Condition 28 - 466-ED-23 - Retaining Walls - External Levels Sheet 2
|
11/06/2019 |
Revised Condition 28 - 466-ED-24 - Retaining Walls - External Levels Sheet 3
|
11/06/2019 |
Revised Condition 14 - 5644-R1 Site Investigation AFU Phase 1 Desktop Study (1 of 2)
|
11/06/2019 |
Revised Condition 14 - 5644-R1 Site Investigation AFU Phase 1 Desktop Study (2 of 2)
|
11/06/2019 |
Revised Condition 14 - Remediation AFU - Earthworks Strategy Report - R-STP3981NM-ES02 (1 of 3)
|
11/06/2019 |
Revised Condition 14 - Remediation AFU - Earthworks Strategy Report - R-STP3981NM-ES02 (2 of 3)
|
11/06/2019 |
Revised Condition 14 - Remediation AFU - Earthworks Strategy Report - R-STP3981NM-ES02 (3 of 3)
|
11/06/2019 |
Revised Condition 14 - Site Investigation AFU Phase 2 Site Investigation - J-D1747-00-R1-NLC (1 of 3)
|
11/06/2019 |
Revised Condition 14 - Site Investigation AFU Phase 2 Site Investigation - J-D1747-00-R1-NLC (2 of 3)
|
11/06/2019 |
Revised Condition 14 - Site Investigation AFU Phase 2 Site Investigation - J-D1747-00-R1-NLC (3 of 3)
|
11/06/2019 |
Revised Condition 14 - Environmental and Geotechnical Appraisal Report- R-STP3981NM-AR01 (1 of 6)
|
11/06/2019 |
Revised Condition 14 - Environmental and Geotechnical Appraisal Report- R-STP3981NM-AR01 (2 of 6)
|
11/06/2019 |
Revised Condition 14 - Environmental and Geotechnical Appraisal Report- R-STP3981NM-AR01 (3 of 6)
|
11/06/2019 |
Revised Condition 14 - Environmental and Geotechnical Appraisal Report- R-STP3981NM-AR01 (4 of 6)
|
11/06/2019 |
Revised Condition 14 - Environmental and Geotechnical Appraisal Report- R-STP3981NM-AR01 (5 of 6)
|
11/06/2019 |
Revised Condition 14 - Environmental and Geotechnical Appraisal Report- R-STP3981NM-AR01 (6 of 6)
|
11/06/2019 |
Revised Condition 26 - Linglongs Road Arboricultural Method Statement - 6270.001 (1 of 2)
|
11/06/2019 |
Revised Condition 26 - Linglongs Road Arboricultural Method Statement - 6270.001 (2 of 2)
|
11/06/2019 |
Revised Condition 28 - 466-ED-02_Drainage Layout - Engineering Layout
|
11/06/2019 |
Revised Condition 7,8 - Construction Method Statement
|
21/06/2019 |
Consultation Response The Coal Authority
|
24/06/2019 |
CCTV survey on existing culvert
|
24/06/2019 |
Sewers combined
|
03/07/2019 |
Consultation Response United Utilities
|
04/07/2019 |
Public Comment Jon Hooley
|
04/07/2019 |
Consultation Response Environmental Health Officer
|
09/07/2019 |
Consultation Response Derbyshire Wildlife Trust
|
10/07/2019 |
Public comment Jonathan Hooley (24)
|
16/07/2019 |
Public Comment Will Mankiewicz
|
16/07/2019 |
Consultation response DCC Flood Risk
|
23/07/2019 |
Revised Conditions 9, 10, 11, 12, 13 Drainage calculations April 2019
|
23/07/2019 |
Revised conditions 9, 10, 11, 12, 13 Drainage Layout TEN Engineering Layout Rev S
|
25/07/2019 |
Re_ DOC_2017_0071 - Discharge of conditions
|
25/07/2019 |
Review and Assessment of Flood Risk Impacts
|
25/07/2019 |
Public Comment Will Mankiewicz
|
30/07/2019 |
Consultation response HPBC Trees
|
01/08/2019 |
Public Comment Martyn Wood
|
01/08/2019 |
Public Comment Martyn Wood
|
01/08/2019 |
consultation response whaley bridge matters
|
02/08/2019 |
consultation response united utilities
|
08/08/2019 |
Consultation Response DCC Highways
|
09/08/2019 |
Consultation Response DCC Highways
|
14/08/2019 |
Revised condition 18 - Bat Mitigation Strategy
|
16/08/2019 |
Additional Details - Condition 24
|
16/08/2019 |
Additional Details - Condition 24
|
16/08/2019 |
Revised Condition 6 - Final Noise Assessment
|
21/08/2019 |
Whaley Bridge Matters United Utilities and trunk main comments
|
21/08/2019 |
Whaley Bridge Matters recent flooding and flood damage near Linglongs Road
|
23/08/2019 |
Revised condition 8 - Final - Construction Method Statament
|
23/08/2019 |
Consultation response Environmental Health
|
27/08/2019 |
Consultation Response Economy Transport and Enviroment
|
28/08/2019 |
Consultation Response United Utilities
|
29/08/2019 |
Consultation Response DCC Flood Risk
|
03/09/2019 |
Public comment Martyn Wood 3
|
04/09/2019 |
Revised condition 23 - Travel Plan
|
04/09/2019 |
Revised condition 23 - Welcome Pack
|
05/09/2019 |
Whaley Bridge Matters drainage consultee clarification
|
06/09/2019 |
Whaley Bridge Matters recent flooding photographs part 1 of 2
|
06/09/2019 |
Whaley Bridge Matters recent flooding photographs part 2 of 2
|
06/09/2019 |
Whaley Bridge Matters GWP Response
|
25/09/2019 |
Consultation Response DCC Flood Risk 3
|
27/09/2019 |
Technical Summary - Drainage
|
27/09/2019 |
Public Comment Whale Bridge Matters re Flood Risk
|
04/10/2019 |
Public comment Martyn Wood
|
04/10/2019 |
Public comment Whaley Bridge Matters Role of DCC(LLFA)
|
07/10/2019 |
Public comment Whaley Bridge Matters - E-mail from DCC to HPBC - 29th August 2019
|
07/10/2019 |
Public comment Whaley Bridge Matters - GWP report - 4th October 2019
|
07/10/2019 |
Public comment Whaley Bridge Matters -additional information and new GWP
|
07/10/2019 |
Photograph of Railway Tunnel below Hockerley estate 290919.
|
07/10/2019 |
Public comment Whaley Bridge Matters - Previous planning mistake in Whaley
|
13/03/2020 |
Decision
|
22/10/2021 |
Condition 14 Site Investigation_AFU_._Topsoil Testing Report _-_Part1
|
22/10/2021 |
Condition 14 Site Investigation_AFU_._Topsoil Testing Report _-_Part2
|
22/10/2021 |
Condition 14 Site Investigation_AFU_._Topsoil Testing Report _-_Part3
|
22/10/2021 |
Condition 14 Site Investigation_AFU_._Topsoil Testing Report _-_Part4
|
22/10/2021 |
Condition 14 Site Investigation_AFU_._Topsoil Testing Report _-_Part5
|
22/10/2021 |
Condition 14 Site Investigation_AFU_._Topsoil Testing Report _-_Part6
|
22/10/2021 |
Condition 14 Site Investigation_AFU_._Topsoil Testing Report _-_Part7
|